EvapTech Gulf Services Newsletter

February 12, 2026

OEM Cooling Towers Built for Performance. Installed for Speed.

When evaluating a cooling tower replacement, owners are balancing two priorities: guaranteed thermal performance and minimal downtime.

EvapTech delivers both.

Proven OEM Performance

EvapTech cooling towers are engineered and validated to meet CTI Standard 202 performance guarantee, giving operators confidence that cold-water temperatures will meet or exceed specified performance under real-world design conditions.

Backed by Evapco’s R&D center, EvapTech integrates proprietary cooling tower technology, including TechClean 410 high-efficiency low-fouling fill, durable FRP structure, and in-house fan blade manufacturing by fanTR. EvapTech offers FM-approved cooling towers for facilities specifying FM Global-certified equipment.

Modules flown into Basin using MegaLift

Designed to Shorten Turnarounds – The MegaLift

Thermal performance is critical. But installation strategy often determines project success.

EvapTech’s patented MegaLift is a lifting construction technology developed by our in-house Engineering team. This technique allows for the pre-construction of the cooling tower modules, mechanical fan assemblies and stair towers to be built adjacent to the basin pre-turnaround.

Once the turnaround begins and the basin is drained, the existing tower is demolished and basin cleaned. The pre-assembled modules are lifted into place and anchored. The mechanical assemblies and stair towers are installed. In Industrial applications, this approach has reduced full tower replacements to as short as nine (9) days — avoiding the costly expense of extended turnarounds, loss production and rental cooling towers!

Modules are pre-assembled for faster, safer installation

Faster Installation. Safer Execution.

Modular construction is not only faster — it is safer.

By shifting more work to before the turnaround begins, EvapTech reduces elevated field assembly, minimizes congestion in the work zone, and lowers total onsite exposure hours. The result is a controlled installation process with a strong emphasis on safety performance. EvapTech’s EMR is third-party validated and has never been above 1.

TechClean Low-Fouling Fill

Planning for a Replacement?

If your Cooling Tower is experiencing declining thermal performance, an aging structure or rising maintenance costs, now is the time to evaluate an OEM replacement.

EvapTech & James Industries are available to review tower conditions, performance requirements, turnaround schedules, and constructability options to identify the most efficient solution for a safe and successful cooling tower replacement project.

Let’s discuss your cooling tower project before your next turnaround window.

We Have Proven Results

The latest CTI Standard 202 results are in, and EvapTech continues to have the only perfect record in tower performance testing. These results reinforce EvapTech’s position as your best choice for fully rated cooling towers.

Expert Support in Your Region

Dan Wolfskill

President
Austin Office
Covers TX, OK, AR, LA, NM

Mike Wolfskill

Director of Sales
Houston Office
Covers TX, LA, and NM

More from Our Friends at EvapTech

Lunch and Learn with EvapTech

Lunch and Learn with EvapTech

EvapTech Gulf Services NewsletterLunch and Learns with EvapTech At EvapTech, we believe the best partnerships start with meaningful...